PROJECT 1
Pile Foundation (Pile and Pile cap work) work of Bangladesh T/L Project 400 KV D/C Rooppur Bogura Transmission Line with Transrail Lighting Ltd.
Rooppur Bogura
Status: Running
Environmental impact of Biomass Power Plant:

N/A

PROJECT 2
Pile Foundation (Pile and Pile cap work) work of Bangladesh T/L Project 230 KV D/C Rooppur Dhamrai Transmission Line with Transrail Lighting Ltd.
Rooppur Dhamrai
Status: Running
Environmental impact of Biomass Power Plant:

N/A.

PROJECT 3
Concrete Block Making Machine
Keraniganj, Near Bosila Bridge
Status: We already set up machinery and others
Environmental impact of Biomass Power Plant:

As concrete block is made of Top soils, that makes it Eco friendly. Concrete block walls are highly resistant to extreme weather conditions such as floods and strong winds, plus, concrete is by nature fire resistant, that means your home will be protected in case of a fire emergency. Good acoustic performance due to mass and damping qualities. A thermal mass that naturally keeps temperatures cool in the summer and warm in the winter. Cost-efficiency; minimal need for ongoing maintenance.

PROJECT 4
Pabna 5mw Biomass Power Plant
Pabna Sadar, Ratanpur Mouza
Status: We already signed Mou with Wuxi Carrysun Technology Co. Ltd
Environmental impact of Biomass Power Plant:

It’s a green project. The benefit of biomass energy is that biomass is renewable source of energy and it cannot be depleted. Biomass helps reduce the amount of GHG that give more impact to global warming and climate change. The biomass emissions level is far smaller compared to fossil fuels. We will generate electricity by collecting Rice Husk from Pabna, Natore, Sirajganj and Kustia..